Main Feed Pumps Parts

End item NSN parts
Filter By: Thrust Ball Bearings
page 1 of 1
Part Number
NSN
NIIN
0BJURE Thrust Ball Bearing
001008522
1102F Thrust Ball Bearing
001561848
180138 Thrust Ball Bearing
001561848
180318 Thrust Ball Bearing
001561848
181789 Thrust Ball Bearing
001008522
20300 Thrust Ball Bearing
001561848
2456F4-27 Thrust Ball Bearing
001008522
2456F6-27 Thrust Ball Bearing
001008522
36694-218 Thrust Ball Bearing
001561848
56272-5 Thrust Ball Bearing
001008522
A2015 Thrust Ball Bearing
001561848
A2313 Thrust Ball Bearing
001008522
BT13 Thrust Ball Bearing
001008522
D13 Thrust Ball Bearing
001008522
E-13 1-104 Thrust Ball Bearing
001008522
E13 Thrust Ball Bearing
001008522
OBJURE Thrust Ball Bearing
001008522
T100 1-2 Thrust Ball Bearing
001727088
Page:

Main Feed Pumps

Picture of Main Feed Pumps

A deaerating feed tank (DFT), often found in steam plants that propel ships, is located after the main condensate pump and before the main feed booster pump. It has these three purposes:

Based on the relevant theoretical Rankine cycle diagram, there are four main processes, or steps:

In the practical implementation of a Rankine cycle, it is common to break the single pump (process 1 to 2) into three pumps: (in water flow order: condensate pump, feed booster pump and then feedwater pump).

A surge volume allows the plant to change bells (power output level) without running the feed pump dry or flooding the turbines. Consider the plant running in a steady state condition.

The bell is increased, more power output demanded, the rate of feed is increased. This draws more water from the condenser, perhaps to the point of being dry and starving the boiler resulting in a loss of propulsion. This is until the water, converted to steam, provides its energy to the turbine and then is condensed in the condenser.

قارن الآن»
واضح | أخفى