Strategic Weapon Systems(poseidon And Trident) Parts

End item NSN parts page 1 of 38
Part Number
NSN
NIIN
0000013-703 Diode Semiconductor Device
008515926
0000261 Pipe Elbow
002469206
0032577-001 Electrical Receptacle Connector
010465427
00415-0404 Hose Mender
002887003
00541 Test Adapter
011613552
00606296011159 U Semiconductor Device Rectifier
001669966
007-0295-00 Transistor
010333079
00927 Flat Washer
004693828
00P636 Hand Operated Arbor Press
002238359
00V Key Blank
004735963
01-83-1109 Electrical Wire
005783244
01-88-7009 Electrical Wire
006170369
010-004577 Connector Adapter
008230308
010-0229-00 Test Lead
004771384
010-6101-05 Test Lead
004771384
010-6101-15 Test Lead
004771384
0100799-00 Annular Ball Bearing
000055981
011-001 Indicator Light
001075166
0122-0245 Diode Semiconductor Device
004771095
Page: 1 ...

Strategic Weapon Systems(poseidon And Trident)

Picture of Strategic Weapon Systems(poseidon And Trident)

The Trident missile is a submarine-launched ballistic missile (SLBM) equipped with multiple independently targetable reentry vehicles (MIRV). Originally developed by Lockheed Missiles and Space Corporation, the missile is armed with thermonuclear warheads and is launched from nuclear-powered ballistic missile submarines (SSBNs). Trident missiles are carried by fourteen US Navy Ohio-class submarines, with US warheads, and four Royal Navy Vanguard-class submarines, with British warheads. The missile is named after the mythological trident of Neptune.

In 1971, The US Navy began studies of an advanced Undersea Long-range Missile System (ULMS). A Decision Coordinating Paper (DCP) for the ULMS was approved on 14 September 1971. ULMS program outlined a long-term modernization plan, which proposed the development of a longer-range missile termed ULMS II, which was to achieve twice the range of the existing Poseidon (ULMS I) missile. In addition to a longer-range missile, a larger submarine (Ohio-class) was proposed to replace the James Madison and Ben Franklin class SSBNs in 1978. The ULMS II missile system was designed to be retrofitted to the existing SSBNs, while also being fitted to the proposed Ohio-class submarine.

قارن الآن»
واضح | أخفى