Armored Vehicle Launch Bridge (m60a1 & M48a5) Parts

End item NSN parts
Filter By: Gaskets
page 1 of 1
Part Number
NSN
NIIN
052-FS001-75 Gasket
000635508
052FS001-75 Gasket
000635508
10911888 Gasket
008889403
10912270 Gasket
004932938
11655077 Gasket
006123799
12304136 Gasket
011290642
5310007729564 Gasket
007729564
5330008889403 Gasket
008889403
5330010306807 Gasket
011290642
5330011290642 Gasket
011290642
7729564 Gasket
007729564
A4159 Gasket
007729564
CS-2300-0001 Gasket
007729564
Page:

Armored Vehicle Launch Bridge (m60a1 & M48a5)

Picture of Armored Vehicle Launch Bridge (m60a1 & M48a5)

The M60 AVLB is an armored vehicle based on the M60 Patton main battle tank chassis used for the launching and retrieval of a 60 feet (18 m) scissors-type bridge. The AVLB consists of three major sections: the launcher, the vehicle hull, and the bridge.

The M60 AVLB is based on a M60 Patton tank chassis, but instead of the tank's gun turret, it is equipped with a bridge launcher integrated into the chassis and mounted on top. When emplaced, the bridge is capable of supporting tracked and wheeled vehicles with a military load bearing capacity up to Class 70. The bridge can be retrieved from either end. The roadway width of the AVLB is 12 feet 6 inches (3.81 m). During deployments, bridge emplacement can be accomplished in 2 minutes, and retrieval can be accomplished in 10 minutes under armor protection.

As of 1996, the U.S. Marines had an inventory of 55 bridges and 37 launchers.

The U.S. Army and Marine Corps are planning to replace the AVLB with the DRS Technologies Joint Assault Bridge (JAB), which is an M1 Abrams tank chassis combined with an 18.3 metres (60 ft)-long scissor bridge. The M60-based AVLB was found to be slower and unable to keep pace with Abrams tanks and M2 Bradley armored vehicles, and its age was making it difficult to maintain and sustain with parts becoming obsolete. The JAB also has a faster deployment time, with a set-up of three minutes compared to AVLB’s six-minute set-up. First deliveries are planned in mid-2017, with low-rate initial production expected to be reached in 2019.

قارن الآن»
واضح | أخفى