رقم الجزء
تجريد
صلاحيه
UOM
NIIN
TXT
وصف:
Radio Frequency Transmiss Switch
MRC:
The style designation indicating the configuration that most nearly corresponds to the appearance of the body.AAQL
Body Style:
Irregular
MRC:
The dimension measured along the longitudinal axis with terminated points at the extreme ends of the item.ABHP
Overall Length:
2.380 inches
MRC:
The distance measured in a straight line from the bottom to the top of an item.ABKW
Overall Height:
1.490 inches
MRC:
An overall measurement taken at right angles to the length of an item,in distinction from thickness.ABMK
Overall Width:
1.930 inches
MRC:
The number of complete cyclic changes,per unit of time,for which an item is rated.ACZB
Frequency Rating:
0.0 gigahertz 1st frequency insertion loss reference and 1.0 gigahertz 1st frequency insertion loss reference
MRC:
The number of complete cyclic changes,per unit of time,for which an item is rated.ACZB
Frequency Rating:
1.5 gigahertz single frequency voltage standing wave ratio and 2.0 gigahertz single frequency voltage standing wave ratio
MRC:
The number of complete cyclic changes,per unit of time,for which an item is rated.ACZB
Frequency Rating:
1.0 gigahertz 2nd frequency insertion loss reference and 2.0 gigahertz 2nd frequency insertion loss reference
MRC:
Indicates the type of switch included in the item.AEEA
Switch Type:
Transfer
MRC:
The minimum and maximum limits of temperature at which the item is rated for operation.AFGA
Operating Tempurature Range:
+0.0/+71.0 degrees celsius
MRC:
A letter or group of letters used to designate the particular coaxial connector series.AHUC
Coaxial Connector Series Designation:
Bnc
MRC:
The amount of radio frequency power handling capability that can be dissipated safely by an item.AKNF
Rf Power Handling Capability:
100.0 watts average 1st
MRC:
The amount of radio frequency power handling capability that can be dissipated safely by an item.AKNF
Rf Power Handling Capability:
3.0 kilowatts peak 2nd
MRC:
An indication of whether the lobe of the rotating cam is designed to actuate /make/ a switch before or after the preceding switch deactuates /breaks/.AKPN
Switch Operation Sequence:
Makes before breaks
MRC:
The time required for switching between any two adjacent positions.AKPP
Switching Time:
35.0 milliseconds
MRC:
The number of coupling positions provided.AKRC
Coupling Position Quantity:
4