رقم الجزء
تجريد
صلاحيه
UOM
NIIN
TXT
وصف:
Hydrogen Generator
MRC:
An indication of whether or not a container from which the item is completely removable in normal operable condition is provided.AFJU
Carrying Case:
Not provided
MRC:
The name and number of parts supplied with the item which may be required for application.AKYD
Accessory Components And Quantity:
Inflating tube assembly 1
MRC:
Indicates the type of unit.APQB
Unit Type:
Immediate consumption
MRC:
The maximum pressure at which the item is designed to operate.BJDW
Maximum Operating Pressure:
Any acceptable
MRC:
The charge used or process employed in the generation of hydrogen.CCJK
Hydrogen Generation Method:
Calcium hydride charge
MRC:
The dimension measured along the longitudinal axis with terminated points at the extreme ends of the cylinder body.CCJL
Err Default:
Err default and err default
MRC:
The dimension measured along the longitudinal axis with terminated points at the extreme ends of the cylinder body.CCJL
Cylinder Bodylength:
Between 10.250 inches and 11.750 inches
MRC:
A measurement of the longest straight line across the cross-sectional plane of the cylinder body.CCJM
Err Default:
Err default and err default
MRC:
A measurement of the longest straight line across the cross-sectional plane of the cylinder body.CCJM
Cylinder Bodydiameter:
Between 3.500 inches and 4.500 inches
MRC:
The technical differentiating characteristic/s/ of an item of supply which depart/s/ from the text of a specification or a standard in that it represents a selection of characteristics stated in the specification or standard as being optional,or a variation from one or more of the stated characteristics,or an additional characteristic not stated in the specification or standard.ZZZW
Departure From Cited Document:
Critical cleaning is not require d